WEBVTT Kind: captions; Language: en 00:00:00.000 --> 00:00:02.001 [...] 00:00:51.000 --> 00:00:54.000 You've all seen bits and pieces of Bart's construction. 00:00:55.001 --> 00:00:57.001 Maybe you've watched some market street digging. 00:00:59.000 --> 00:01:01.000 Seen the completed Albany aerials. 00:01:02.001 --> 00:01:06.001 Been inconvenienced in downtown Oakland or on Shattuck Avenue in Berkeley. 00:01:09.001 --> 00:01:13.000 Past a Rinda crossroads and figured all those bulldozers were just leveling 00:01:13.000 --> 00:01:14.001 another hillside for another freeway. 00:01:15.001 --> 00:01:20.000 But whatever you've seen or bypassed or wondered about, you've only seen a small 00:01:20.000 --> 00:01:23.001 part of a 75 mile system now being built in three counties. 00:01:24.000 --> 00:01:28.001 We want you to see some facts about your new inter-urban rapid transit 00:01:28.001 --> 00:01:31.000 system. Not just read about it. 00:01:31.001 --> 00:01:34.000 So watch and we'll keep quiet most of the time. 00:01:36.001 --> 00:01:38.000 First, let's take a look from the air. 00:01:39.001 --> 00:01:43.000 The completed Albany aerials structures, part of the Richmond-Berkeley line. 00:01:44.001 --> 00:01:47.000 The same type of aerials under construction in Hayward. 00:01:47.001 --> 00:01:49.001 A section of the Fremont-Oakland line. 00:01:50.000 --> 00:01:53.001 And incidentally, even as you watch this film, all the 00:01:53.001 --> 00:01:55.001 construction you're looking at has progressed. 00:01:56.001 --> 00:01:59.001 What you're seeing is how it looked the day we filmed it. 00:02:02.000 --> 00:02:05.000 And the day our camera saw this was several months ago. 00:02:06.001 --> 00:02:08.001 Entrance to the downtown Oakland subway. 00:02:14.001 --> 00:02:18.001 The Lake Merritt tidal outfall. 00:02:33.001 --> 00:02:36.001 Up Broadway and the crossover to the Berkeley and Contra Costa lines. 00:03:00.000 --> 00:03:01.001 Now let's look more closely. 00:03:02.001 --> 00:03:06.000 First, getting ready for the Transbay tube linking Oakland and San Francisco. 00:03:06.001 --> 00:03:10.000 Which will enter the bay at the site of the Oakland Mall, cross under the bridge 00:03:10.000 --> 00:03:13.000 and enter the Market Street subway under the ferry building. 00:03:16.000 --> 00:03:20.001 Pilings that mark the old ferry boat slips must be pulled up and hauled away. 00:03:26.000 --> 00:03:31.000 High pressure hoses loosen dirt around the base. 00:03:34.001 --> 00:03:39.001 The old San Francisco wharves dating back to the time of ferry boat commuting are 00:03:39.001 --> 00:03:41.001 removed to make way for high speed trains. 00:03:41.001 --> 00:03:45.001 Which will make the trip from Oakland to San Francisco in eight minutes. 00:03:49.000 --> 00:03:53.001 The tube itself will consist of 57 sections like this one, ready 00:03:53.001 --> 00:03:55.000 for launching at Bethlehem shipyard. 00:04:01.001 --> 00:04:06.001 Each double barreled section is 350 feet long and weighs some 800 00:04:06.001 --> 00:04:08.000 tons when it slides into the bay. 00:04:22.000 --> 00:04:26.001 After launching, the section is nudged to an outfitting dock where reinforced 00:04:26.001 --> 00:04:31.001 concrete is applied to the interior walls until its weight reaches 12,000 tons. 00:04:32.000 --> 00:04:34.000 More than a World War II Liberty ship. 00:04:35.000 --> 00:04:39.001 In the early morning hours when traffic is light on the bay, the section is towed 00:04:39.001 --> 00:04:44.000 to the Oakland side where it's slung beneath a giant catamaran barge and gently 00:04:44.000 --> 00:04:48.000 lowered into place along a shallow trench dredged across the floor of the bay. 00:04:49.001 --> 00:04:52.000 Hydraulic couplers lock each section to its mate. 00:04:53.000 --> 00:04:57.000 They're made watertight and the process is repeated for the 57 sections 00:04:57.000 --> 00:04:59.000 and four long years. 00:05:00.001 --> 00:05:06.000 While section after section of bay tube is built and launched, Bart's work 00:05:06.000 --> 00:05:09.000 progresses in more than a dozen sites in the three counties. 00:05:11.000 --> 00:05:13.000 Demolition to make way for aerial structures. 00:05:18.001 --> 00:05:22.001 Cut and cover in downtown Oakland for the subway. 00:05:24.000 --> 00:05:27.000 Moving utilities and sewers for the San Francisco subway. 00:05:28.000 --> 00:05:32.001 But one substantial contribution to the system is being made far enough from your 00:05:32.001 --> 00:05:35.001 front door that it's no inconvenience at all. 00:05:36.001 --> 00:05:40.001 The Kaiser plant in Napa is making steel tunnel liners for the 21 miles of 00:05:40.001 --> 00:05:43.001 subway, almost one third of the total bark system. 00:05:45.000 --> 00:05:48.000 First, a gang burner cuts the five-ton sheet of steel. 00:05:54.001 --> 00:05:57.000 A giant magnet lifts the cut piece. 00:05:59.000 --> 00:06:02.001 After the inside seams are welded, this section will be bent. 00:06:18.000 --> 00:06:22.000 And the final large ring undergoes processing, some automatic. 00:06:25.001 --> 00:06:31.000 The bent sections go to the huge welding bay. 00:06:36.000 --> 00:06:43.000 More treatment and constant inspection. 00:06:44.001 --> 00:06:49.000 Finally, milling and grinding to complete each three-ton ring. 00:06:58.000 --> 00:07:02.000 Stacked and stored. 00:07:03.000 --> 00:07:05.000 Ready to be placed in Bart's subways. 00:07:06.001 --> 00:07:11.000 Closer to home and part of your surface riot, Orinda Crossroads. 00:07:12.001 --> 00:07:16.000 These bulldozers were leveling a hillside for a new freeway. 00:07:16.001 --> 00:07:21.000 Not only relocated, but widened to accommodate Bart trains in the median strip. 00:07:22.000 --> 00:07:26.000 It's estimated that this portion of the Concord to Berkeley line will save 00:07:26.000 --> 00:07:30.001 taxpayers millions of dollars because of the joint use of a narrow transportation 00:07:30.001 --> 00:07:34.000 corridor by Bart and the California Division of Highways. 00:07:35.001 --> 00:07:38.000 What about the route from Orinda to Berkeley? 00:07:38.001 --> 00:07:42.001 Over the hills where there is no transportation corridor, even a narrow one. 00:07:43.001 --> 00:07:46.000 The answer is through these hills. 00:07:47.000 --> 00:07:51.000 We can fly from the east portal, Orinda side, to the 00:07:51.000 --> 00:07:52.001 west portal in a few minutes. 00:07:53.001 --> 00:07:59.000 It's taking two years to tunnel these hills, but your Bart train will make the 00:07:59.000 --> 00:08:01.000 trip in three and one half minutes. 00:08:03.000 --> 00:08:06.000 So now the highlight of our get ready year. 00:08:07.000 --> 00:08:10.001 Breaking through from the east and west portals of the Berkeley Hills Tunnel. 00:08:11.001 --> 00:08:15.001 A Bart staff member watched the breakthrough, and he reports. 00:08:16.001 --> 00:08:20.000 Thursday, February 23rd, 1967, 11 p.m. 00:08:20.001 --> 00:08:24.000 Word goes out, tunnel will hold through sometime during the graveyard shift. 00:08:25.000 --> 00:08:27.000 Friday, February 24th, 2.10 a.m. 00:08:28.000 --> 00:08:32.001 Daffining Den as jumbo red crew drills holes in face for first of what was to be 00:08:32.001 --> 00:08:36.000 three blasts during the shift. 2.30 a.m. 00:08:36.001 --> 00:08:41.000 During a pause, speculation on part of the miners as to who will win the $300 00:08:41.000 --> 00:08:45.001 pool predicting exact minute of breakthrough. 60 men, $5 apiece. 00:08:46.001 --> 00:08:49.000 Dynamite set off in small charges for safety of both 00:08:49.000 --> 00:08:50.001 crews working so close together. 00:08:51.001 --> 00:08:55.000 Told it would be a long night. 4 a.m. 00:08:55.001 --> 00:08:57.001 Muck crew cleans up face from last blast. 00:08:58.001 --> 00:09:02.001 Discouraging report, tunnelers have to install two more tunnel rings before 00:09:02.001 --> 00:09:06.000 another blast. 6 a.m. 00:09:06.001 --> 00:09:07.000 Exciting news. 00:09:08.000 --> 00:09:10.000 Tunnelers have opened a three foot long shaft for the drill 00:09:10.000 --> 00:09:12.000 and can talk to the Arinda crew. 00:09:13.001 --> 00:09:17.001 Furious work with pry rods enlarges holes the size of a football and last blast 00:09:17.001 --> 00:09:19.000 neatly open the entire top of the face. 00:09:19.001 --> 00:09:25.000 Both crews move sharply to shore up ceiling and then after 446 days of working 00:09:25.000 --> 00:09:28.001 opposite each other, exchange places in their own type of ceremony. 00:09:29.001 --> 00:09:39.000 Saturday, February 25th, 10 a.m. 00:09:40.000 --> 00:09:43.001 Alameda and Contra Costa County officials, park directors, engineers, 00:09:44.000 --> 00:09:45.001 members of the press don yellow slickers. 00:09:46.000 --> 00:09:48.001 Take the first ride all the way through the fourth longest 00:09:48.001 --> 00:09:50.000 vehicular tunnel in the United States. 00:09:51.001 --> 00:09:56.001 And meet in a modest ceremony deep in the 00:09:56.001 --> 00:09:58.000 Berkeley Hills marking the holding through. 00:10:01.001 --> 00:10:06.001 And when your BART train emerges from the Berkeley Hills tunnel, it will glide 00:10:06.001 --> 00:10:11.001 along another medium strip, that of the Grove Shafter Freeway, so called missing 00:10:11.001 --> 00:10:13.001 link in the Bay Area's highway system. 00:10:14.000 --> 00:10:17.001 BART trains will enter the downtown Oakland subway from the 00:10:17.001 --> 00:10:19.000 Grove Shafter Freeway medium. 00:10:20.000 --> 00:10:23.000 And you will enter the same subway from southern Alameda 00:10:23.000 --> 00:10:25.000 County at 8th and Fallon Streets. 00:10:25.001 --> 00:10:29.001 A few blocks from BART's headquarters building and automatic train control 00:10:29.001 --> 00:10:34.000 complex, nerve center for the computerized 75 mile network. 00:10:35.000 --> 00:10:38.001 Work started on this subway in late fall 1965. 00:10:40.000 --> 00:10:43.001 A year ago, this section of the subway had progressed this far. 00:11:01.000 --> 00:11:07.000 Music Today, the structure is ready for tracks, trains, and ultimately, you. 00:11:11.001 --> 00:11:14.001 What will the aerials really look like? 00:11:16.000 --> 00:11:18.000 Completed and landscaped like this. 00:11:19.001 --> 00:11:23.001 The four and one half mile test track between Concord and Walnut Creek. 00:11:27.000 --> 00:11:33.001 We can't show 00:11:33.001 --> 00:11:35.000 you the market street subway yet. 00:11:36.000 --> 00:11:43.000 But if you don't like temporary detours, traffic jams, and gaping holes, wait. 00:11:44.001 --> 00:11:47.001 Construction of the downtown Oakland subway makes a few 00:11:47.001 --> 00:11:49.000 detours seem like a picnic. 00:11:52.000 --> 00:11:57.000 And Berkeley pedestrians and motorists are already living with huge excavations. 00:11:57.001 --> 00:12:04.001 As General Manager B.R. Stokes told the Commonwealth Club in April 1967, the next 00:12:04.001 --> 00:12:09.001 two years or so will be years of travail, of digging dirt, of erecting 00:12:09.001 --> 00:12:11.001 steel, of pouring concrete. 00:12:12.001 --> 00:12:17.000 I pledge that everyone associated with the district will do his level best to 00:12:17.000 --> 00:12:21.001 deliver this system to you as nearly on schedule as is humanly possible. 00:12:22.000 --> 00:12:26.000 We've said that it will be the finest in the world. We promise you it 00:12:26.000 --> 00:12:27.001 will be no less than that. 00:12:29.001 --> 00:12:34.000 Today, more than half the 75 mile system is under construction. 00:12:34.001 --> 00:12:40.001 But tomorrow, next month, next year, as heavy construction increases, you'll find 00:12:40.001 --> 00:12:42.001 more detours, not fewer. 00:12:43.000 --> 00:12:48.000 More blocked off traffic lanes and excavations, all of which are 00:12:48.000 --> 00:12:49.001 necessary inconveniences. 00:12:50.000 --> 00:12:53.000 But happily, temporary. 00:12:56.000 --> 00:13:02.000 So when you see this, or this, 00:13:05.000 --> 00:13:07.000 or this, 00:13:11.001 --> 00:13:16.001 remember, this daily reality of inconvenience is all part of getting ready. 00:13:17.000 --> 00:13:23.001 Getting ready to bring you the speed, the safety, the comfort and convenience, 00:13:24.000 --> 00:13:28.001 and the economy of the world's newest interurban rapid transit system.